Hampton Roads District Weekly Traffic Alert: May 31-June 6, 2026 (2026)

Hampton Roads District Weekly Traffic Alert: May 31-June 6, 2026

May 29, 2026

All work is scheduled weather permitting. Updated information on work zones and lane closures is available on 511.vdot.virginia.gov.

NOTE: This list covers full closures of interstates, ramps, bridges, and primary roads, as well as lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise, and James River bridges.

Scheduled closures are subject to change based on weather conditions and other factors.

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511 Virginia (https://511.vdot.virginia.gov/), download the VDOT 511 smartphone app (https://www.vdot.virginia.gov/#d.en.11810), or dial 511.

Bridges and Tunnels

  • Hampton Roads Bridge-Tunnel, I-64:
    • Single-lane closures from 9 p.m. to 5 a.m.:
    • Eastbound: June 2, 4
    • Westbound: June 1, 3
  • Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
    • Alternating, single-lane closures in both directions: June 1-4 from 9 p.m. to 5 a.m.
    • Alternating, mobile, single-lane closures southbound: June 2 from 9 a.m. to 2 p.m.
  • High Rise Bridge, I-64:
    • Mobile, single-lane closures eastbound: May 31-June 4 from 10 p.m. to 5 a.m.
  • Berkley Bridge, I-264:
    • Alternating, mobile, single-lane closures in both directions: May 31-June 4 from 9 p.m. to 5 a.m.
  • Elizabeth River Crossings (Downtown/Midtown Tunnels):
    • Visit DriveERC.com (https://driveerc.com/home) for scheduled closures.
  • HRBT Expansion Project:
    • View lane closures and project updates.

Interstates

  • I-64, Chesapeake:
    • Full ramp closures from I-64 east to I-464 north (exit 291A):
    • May 31: 12:01 a.m. to 8 a.m., 10 p.m. to 5 a.m.
    • June 1-6: As early as 11 p.m. to as late as 6 a.m.
  • I-64, Gap Widening Segment C, James City County:
    • Single-lane closures on I-64 east and west: June 1-5 from as early as 7 p.m. to as late as 6 a.m.
    • Full off-ramp closure of the I-64 west ramp to Yorktown Road (exit 231): June 1-5, from as early as 7 p.m. to 5 a.m.
    • Long-term traffic shifts on I-64 west and east.
  • I-64, Hampton Roads Express Lanes (HREL):
    • Additional information on express lanes project-related closures and traffic impacts.
    • Interactive map displaying long-term traffic impacts.
  • I-64, Norfolk Reversible Express Lanes:
    • Full closure in both directions:
    • Continuously from 8 p.m. May 29 until 3 a.m. June 1
    • June 1-5 from 9:30 a.m. to 12:30 p.m.
    • May 31-June 4 from 8 p.m. to as late as 4 a.m.
    • Continuously from 8 p.m. June 5 until 3 a.m. June 8
  • I-64, Chesapeake Express Lanes:
    • Full Express Lane closures between specific interchanges and roads.
  • I-64, HREL Hampton 4C Project:
    • Full ramp closures and lane closures on I-64.
    • Long-term traffic shifts and lane reductions.
  • I-64, HREL Norfolk 1A Project:
    • Single-lane closures and full ramp closures on I-64.
    • Long-term traffic shifts and lane reductions.
  • I-64, HREL Newport News/Hampton 4A/4B Project:
    • Multiple lane closures and full off-ramp closures on I-64.
    • Long-term traffic shifts and lane reductions.
  • I-464, Chesapeake:
    • Full on-ramp closures from Route 17 (Dominion Boulevard) north to I-464 north.
    • Full ramp closure from I-464 south to I-64 west (exit 1A).
  • I-264, Portsmouth:
    • Temporary long-term stop sign on the on-ramp from southbound Frederick Boulevard (Route 17) to I-264 west.
  • I-264, Norfolk:
    • Full off-ramp closures from I-264 west.
    • Full on-ramp closure from City Hall Avenue to I-264 east.
  • I-264, Virginia Beach:
    • Full off-ramp closures from I-264 west to Witchduck Road (exit 16).
  • I-664, Chesapeake:
    • Full off-ramp closures from I-664 south to Portsmouth Boulevard (exit 11A).
  • I-564/Intermodal Connector, Norfolk:
    • Full off-ramp closures and full on/off-ramp closures.

Other Notable Closures

  • Route 17, York County:
    • Full ramp closure from Route 17 (George Washington Memorial Highway) south to Route 134 (Hampton Highway) east: June 2-5 from 4 a.m. to 2 p.m.

Last updated: May 29, 2026

Hampton Roads District Weekly Traffic Alert: May 31-June 6, 2026 (2026)
Top Articles
Latest Posts
Recommended Articles
Article information

Author: Chrissy Homenick

Last Updated:

Views: 6184

Rating: 4.3 / 5 (74 voted)

Reviews: 89% of readers found this page helpful

Author information

Name: Chrissy Homenick

Birthday: 2001-10-22

Address: 611 Kuhn Oval, Feltonbury, NY 02783-3818

Phone: +96619177651654

Job: Mining Representative

Hobby: amateur radio, Sculling, Knife making, Gardening, Watching movies, Gunsmithing, Video gaming

Introduction: My name is Chrissy Homenick, I am a tender, funny, determined, tender, glorious, fancy, enthusiastic person who loves writing and wants to share my knowledge and understanding with you.